The smarter, faster, and more community-friendly way to complete the final phase of Santa Clara Valley Transportation Authority’s BART (Bay Area Rapid Transit) Silicon Valley Extension is a single-bore tunnel, according to a recently released study.
According to the study, a single-bore tunnel is faster to build, more cost effective, and would keep streets in downtown San Jose open during construction. The traditional cut-and-cover construction method involves digging up streets and rebuilding them, a method that results in noise, full street closures, and utility relocations. The single-bore tunnel method places infrastructure deep underground, resulting in fewer surface impacts, less traffic disruption, and a better environment for local businesses.
“The VTA and BART boards of directors endorsed the plan, and the Federal Transit Administration has issued its record of decision, clearing the way for engineering and construction to proceed,” the VTA said in a statement. “Switching to a twin-bore design would require restarting environmental reviews, repeating engineering work, and buying new tunnel boring machines ‒ delaying progress and increasing costs.”
The single-bore tunnel was approved in 2018, and the VTA continues to advance the single-bore tunnel as the preferred design for extending BART through downtown San José to Santa Clara.